State Swim Kwinana Learn to Swim Pool

,

We were engaged by discerning client State Swim to construct their newest learn to swim pool in Kwinana. The new centre was designed to accommodate not only young children in learn to swim programs, but for those wishing to improve their swimming ability for competitive swimming. To ensure that the pool met the high standard of the other State Swim facilities, we worked closely with the client to deliver this quality project on time and within budget.

A 200mm deep ledge was constructed to the length of the pool for use during toddler and baby swim classes.

The fully tiled pool takes inspiration from the colour scheme of the centre, using a selection of brightly coloured tiles for the waterline in the traditional State Swim colour system.
Extensive lane ropes and anchor points are installed to zone the pool for various swim school programmes.

The pool water is treated by a sodium hypochlorite and Co2 water treatment system complete with UV sanitisation. Two Praga 1400 media filters were installed as well as a 10,000L backwash tank installed underneath the plant room floor. To ensure the pool is kept at a constant temperature for the public to enjoy their swimming lessons, 2 Accent electric heat pumps were installed.

Since opening, the pool has witnessed the enjoyment of many children and adults who use the pool daily to initiate, learn and improve on their swimming ability.

Gold Winner in the SPASA WA Awards of Excellence for 2016.

Midland Health Campus Hydrotherapy Pool

,

As part of the newly completed multi-million dollar St John of God Midland Health Campus, we were engaged by principal contractor Brookfield Multiplex to construct the hydrotherapy pool. Delivered on time and on budget, this highly specified pool required extensive planning and management to ensure the fully tiled 4m x 8m pool met not only the health and safety regulations, but also mirrored the high quality finishes that are seen throughout the hospital.

Designed for rehabilitation and water based therapy, the hydrotherapy pool uses a heat exchange system ensuring constant water temperature for patients. A Prominent water treatment system complete with UV sanitation is part of the extensive equipment used in the construction which also includes an Atlas Stainless steel pre-coat filter. A wet deck with an extensive balance tank was designed and installed, allowing the waterline to be at concourse level and consistent with the pool surrounds.

The pool has been designed for people with restricted mobility in mind. The depth ranging from 1.2m to 1.5m means that patients are able to walk through the pool with varied resistance whilst extensive stainless steel handrails to all pool walls and step entry allows for independent access. An AKRAS hoist system was installed to permit access for patients with impaired mobility.

Winner in the SPASA WA Awards of Excellence for 2016.

Roy Hill Village Lap Pool – Newman

,

Situated in the remote Pilbara, the nature of distance, climate, the environment and a challenging site were not a problem to our team. Working with a fantastic client – Brookfield Multiplex on the iconic Roy Hill project was a privilege and one we are proud to have within our expanding portfolio.

The brief for the design and construction of a 25m x 10m fully tiled lap pool and 6m x 6m fully tiled relaxation pool was delivered without a hiccup, on time and on budget.

Consisting of a fully tiled interior with lane markings and lane rope the Lap pool provides an inviting space for aquatic exercise. The relaxation pool with a 12 m long by 500mm deep bench provides a shaded social space to cool off and relax with colleagues and friends. The pool water is treated by 3 commercial sand filter and pump systems and the water is chemically treated by automated ORP and pH control systems. Cleaning the pool is easy with the inclusion of a twin head robotic cleaner. The pool has become a huge benefit and focal point to the Roy Hill village community.

Winner in the SPASA WA Awards of Excellence 2014.

Punurunha Village Lap Pool – Marandoo

Contracted by TAG – Principal contractor to Lycopodium –  EPCM to Rio Tinto, we constructed the 25m x 8m Lap Pool at the mine site village in Marandoo.

The lap pool features a Disabled Access Hoist, Electronic Auto Top up systems, Maytronics Dolphin Robotic Cleaner and Palintest Test Kit as well as commercial filtration system.

Shade cloths cover one end of the pool, providing relief from the sun, whilst allowing for workers to maintain their activity or relax and cool off in the pool.

Baynton Apartment Geometric Pool – Karratha

The Geometric Pool at the Baynton Apartments in Karratha was constructed for client Jaxon Construction in 2014.

The 14m x 16m leisure pool features Electronic Auto Top up systems, Disabled Access Hoist and commercial filtration systems.

Finished in Quartz interior, the pool fits in perfectly with the apartment complex, providing a spot to relax and cool off for residents.